Welcome to ExamTopics
ExamTopics Logo
- Expert Verified, Online, Free.

Unlimited Access

Get Unlimited Contributor Access to the all ExamTopics Exams!
Take advantage of PDF Files for 1000+ Exams along with community discussions and pass IT Certification Exams Easily.

Exam AD01 topic 1 question 29 discussion

Actual exam question from Blue Prism's AD01
Question #: 29
Topic #: 1
[All AD01 Questions]

Consider the following process flow:

What is the problem with this flow?

  • A. There is nothing wrong with this flow.
  • B. The exception handling in this flow can be removed because an Attach action in a navigate stage should always work if configured correctly
  • C. The Attach Block should be enlarged to also include the "˜Waited Long Enough?' decision stage.
  • D. The flow contains a recover stage and a route from it without a resume stage. This will cause internal error on future exceptions thrown in the same session.
  • E. The 0.5 second wait stage should be removed so that the retries can be performed at full speed.
Show Suggested Answer Hide Answer
Suggested Answer: B 🗳️

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
VishalS
Highly Voted 3 years, 8 months ago
A should be the correct answer
upvoted 11 times
...
DePackage
Most Recent 6 months, 1 week ago
Selected Answer: A
Can't be E there is only one wait stage.
upvoted 1 times
...
neno2023
7 months ago
Selected Answer: A
but I think it must have a decision stage before
upvoted 1 times
...
onyeisi
7 months, 4 weeks ago
A is the answer
upvoted 1 times
...
shubhamvadnere
11 months, 1 week ago
Selected Answer: E
Correct option is E as two 0.5 sec wait is added and it is not required there.
upvoted 1 times
...
LH1213
1 year ago
I think B
upvoted 1 times
LH1213
11 months, 1 week ago
ACTUALLY, IT IS A
upvoted 1 times
...
...
Kaleopan
1 year, 11 months ago
I can see why B should be the correct answer, because attach stages should be preceded by the conditions "Exists=True" and "IsConnected=False", but claiming that an attach stage should then ALWAYS work is kind of a big claim esp. when the target application is in an instable/not responding state.
upvoted 1 times
...
BP_Bot1
2 years, 3 months ago
vote E.
upvoted 2 times
...
Aravind_Babu
2 years, 3 months ago
No option seems to be correct as if Attach stage throws an exception then it is entering into the indefinite loop.
upvoted 2 times
...
ite
2 years, 4 months ago
A should be the answer
upvoted 1 times
...
SBWeiss348
2 years, 8 months ago
I like A because the Attach action could have an error
upvoted 1 times
...
sogoku_ichi_2907
2 years, 10 months ago
A is the correct answer.
upvoted 1 times
...
Ad01blueprism170
2 years, 11 months ago
attach action should contain dynamic variable for resetting the window title incase of exception.
upvoted 1 times
...
naive91
3 years, 1 month ago
Who gives the right answer for such questions
upvoted 3 times
...
TOMMY2212
3 years, 8 months ago
vote for E
upvoted 4 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...