A company wants to migrate its SAP S/4HANA infrastructure to AWS. The infrastructure includes production, pre-production, test, and development environments. The pre-production environment is an identical copy of the production environment.
The production system must comply with a new policy that requires the landscape to be able to fail over to a secondary AWS Region. The required RPO is 5 minutes. The required RTO is 4 hours. The estimated SAP HANA database size is 6 TB.
Which solution will meet these requirements MOST cost-effectively?