Welcome to ExamTopics
ExamTopics Logo
- Expert Verified, Online, Free.

Unlimited Access

Get Unlimited Contributor Access to the all ExamTopics Exams!
Take advantage of PDF Files for 1000+ Exams along with community discussions and pass IT Certification Exams Easily.

Exam RCDD-001 topic 23 question 6 discussion

Actual exam question from BICSI's RCDD-001
Question #: 6
Topic #: 23
[All RCDD-001 Questions]

Exhibit:

In this future marina layout, assuming that there are fewer than 10 slips being cabled, what would be the pre-cabling guideline to follow for terminal A?

  • A. Installed one or two pair cables from the boat slips to a distribution terminal on the closest point of land.
  • B. Place distribution cable onto the dock and terminate in a suitable cabinet or enclosure. Install service drop to each boat slip.
  • C. Pre-cable each boat slip during construction.
  • D. For security, each install should be terminated in the patch panel/cross-connect at the dockmaster or marina office.
Show Suggested Answer Hide Answer
Suggested Answer: A 🗳️

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
CUB90
6 months ago
What is the difference between questions #4 and #6 on this topic? Similar questions with different answers. Can someone explain?
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...