Exam RCDD-001 topic 5 question 12 discussion

Actual exam question from BICSI's RCDD-001
Question #: 12
Topic #: 5
[All RCDD-001 Questions]

You are designing a horizontal distribution system that will have a zone box located 71.6 m (235 ft) away from the telecommunications room (TR). A 50 mm (2 in) conduit is designed from the TR to a pull box located 36.6 m (120 ft) away from the TR. A 1 1/2 inch conduit is designed from the pull box to the zone box located
35.1 m (115 ft) beyond the pull box. Assuming no conduit bends, and excluding the TR and zone box, what is the total number of pull boxes/pull points required in this horizontal conduit system between the telecommunications room (TR) and zone box?

  • A. 2
  • B. 3
  • C. 4
  • D. 5
Show Suggested Answer Hide Answer
Suggested Answer: B 🗳️

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
CUB90
5 months, 3 weeks ago
The answer is 3 pull boxes total. One pull box "A" already exists at 120ft from the TR. The second pull box "B" is to be placed between the TR and the pull box "A" because the distance is over 100 ft. The third pull box "C" is to be placed between pull box "A" and the zone box because the distance is over 100 ft.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.