Question #: 324
Topic #: 1
[All 350-501 Questions]



Refer to the exhibit. The network engineer is performing end-to-end MPLS path testing with these conditions:

• Users must perform MPLS OAM for all available same-cost paths from R1 to R4.
• Traceroute operations must return all of the next-hop IP details.

Which configuration meets these requirements?

  • A. traceroute mpls ipv4 10.10.10.4 255.255.255.255 verbose
  • B. traceroute mpls multipath ipv4 10.10.10.4 255.255.255.255
  • C. traceroute mpls multipath ipv4 10.10.10.4 255.255.255.255 verbose
  • D. traceroute mpls ipv4 10.10.10.4 255.255.255.255 source 10.10.10.1
Show Suggested Answer Hide Answer
Suggested Answer: C 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
thejag
7 months, 3 weeks ago
C is the answer Using verbose knob in above command will list all the hops as below: R1#traceroute mpls multipath ipv4 10.1.5.5 255.255.255.255 verbose https://www.cisco.com/c/en/us/support/docs/multiprotocol-label-switching-mpls/multiprotocol-label-switching-mpls/200097-MPLS-LSP-Multipath-Trace.html
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago