Refer to the exhibit. An engineer configures a static port binding for EPG-3. These Cisco ACI objects are already configured:
• The EPG-3 is associated with a physical domain.
• The physical domain is associated with a VLAN pool called VLP-1.
• The VLAN pool contains VLANs 200-250.
Which step completes the configuration?
sailorsoul
1 year agoDash
1 year, 7 months agoLorygru
1 year, 8 months ago