exam questions

Exam 300-425 All Questions

View all questions & answers for the 300-425 exam

Exam 300-425 topic 1 question 221 discussion

Actual exam question from Cisco's 300-425
Question #: 221
Topic #: 1
[All 300-425 Questions]



Refer to the exhibit. A consulting engineer is preparing to survey a greenfield deployment for a 6000-sqft building with four floors. To prepare for the predeployment survey, the engineer uses a third-party simulation tool. With the default settings on the tool, the survey report shows that the RF signal extends far outside the building walls or areas where data points were taken. The engineer must configure the tool with site properties based on the provided building and floor specifications. Which change must the engineer make to the survey tool?

  • A. Increase the Signal Propagation Assessment height.
  • B. Increase the map dimensions to fit the extended signal.
  • C. Decrease the Signal Propagation Assessment height.
  • D. Reduce the AP default power.
Show Suggested Answer Hide Answer
Suggested Answer: C 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
Seidor_Analytics
2 weeks, 1 day ago
Selected Answer: B
My initial thought is B, and after re-reading, I'm sticking with it.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...