I believe DE is correct..
According to https://haystacknetworks.com/cisco-aci-multi-pod-ipn-inter-pod-network-configuration-verification
See these snips:
The links (interfaces) between the IPN devices and the spine switches must have the following OSPF configuration on the interfaces (as discussed, these are actually the sub-i
nterfaces for VLAN-4).
.....
Cisco ACI requires\recommends (works best with) bi-dir multicast as we have many sources and many receivers
Correct - D and E
https://www.cisco.com/c/en/us/solutions/collateral/data-center-virtualization/application-centric-infrastructure/white-paper-c11-737855.html
When implementing a Cisco ACI Multi-Pod fabric, the Inter-Pod Network (IPN) must meet specific requirements to ensure proper communication and functionality across pods. These requirements include:
PIM ASM Multicast Routing:
Multicast is required in the IPN to handle BUM (Broadcast, Unknown Unicast, and Multicast) traffic across pods. Specifically, PIM ASM (Protocol Independent Multicast - Any Source Multicast) or PIM Bidirectional is used to replicate BUM traffic between the pods efficiently.
OSPF Routing:
The IPN must support OSPF (Open Shortest Path First) routing for establishing connectivity between spine nodes and IPN devices. OSPF is used to advertise the TEP (Tunnel Endpoint) pool prefixes between pods and ensure end-to-end IP reachability for VXLAN tunnels.
Uses dot1.q with Vlan4 and OSPF for routing:
interface Ethernet1/1.4
description 40G Link to POD1-SPINE-101(1/1)
mtu 9150
encapsulation dot1q 4
vrf member fabric-mpod-vrf
ip address 192.168.1.253/30
ip ospf network point-to-point
Answer : DE
The spine interfaces are connected to the IPN devices through point-to-point routed interfaces. However, traffic originated from the spine interfaces is always tagged with an 802.1q VLAN 4 value
PIM Bidir used in the IPN network -
Since BUM traffic can be originated by all the leaf nodes deployed across Pods, the use of a different PIM protocol (like PIM ASM, for example) would results in the creation of multiple individual (S, G) entries on the IPN devices that may exceed the specific platform capabilities. With PIM Bidir, a single (*, G) entry must be created for a given BD, independently from the overall number of leaf nodes.
They ask if PIM ASM are required not PIM Bidir :-)
upvoted 7 times
...
...
This section is not available anymore. Please use the main Exam Page.300-620 Exam Questions
Log in to ExamTopics
Sign in:
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one.
So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
hybersat
Highly Voted 4 years, 3 months agohybersat
4 years, 3 months agomemelas
4 years, 3 months agoprospio971
Most Recent 2 months, 3 weeks agoKastel
6 months agoslogoheinzy
11 months, 2 weeks agoSmoothey
3 years agothomyohan
3 years, 10 months agothiyagas
4 years, 3 months ago[Removed]
4 years, 3 months agohybersat
4 years, 3 months ago