A wireless engineer must optimize RF performance for multiple buildings with multiple types of construction and user density. Which two actions must be taken? (Choose two.)
A.
Configure FlexConnect groups for each building.
This section is not available anymore. Please use the main Exam Page.300-425 Exam Questions