A company is moving to new location. The systems administrator has provided the following server room requirements to the facilities staff:

• Consistent power levels in case of brownouts or voltage spikes
• A minimum of 30 minutes runtime following a power outage
• Ability to trigger graceful shutdowns of critical systems

Which of the following would BEST meet the requirements?

  • A. Maintaining a standby, gas-powered generator
  • B. Using large surge suppressors on computer equipment
  • C. Configuring managed PDUs to monitor power levels
  • D. Deploying an appropriately sized, network-connected UPS device
Show Suggested Answer Hide Answer
Suggested Answer: D 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
benni3c
Highly Voted 1 year, 8 months ago
Passed the test today. This group is awesome. The info here is legit!
upvoted 24 times
...
gho5tface
Highly Voted 1 year, 8 months ago
420...smoke up
upvoted 10 times
[Removed]
1 year, 8 months ago
Dont have much longer now. Goodluck
upvoted 2 times
...
...
RyanL26
Most Recent 1 year ago
Selected Answer: D
Guys, whenever I see brownouts, I think UPS. UPS trucks are brown HAHA!
upvoted 6 times
...
NetworkTester1235
1 year, 1 month ago
We've made it to the end. Good luck to all you test takers!
upvoted 3 times
...
LordJaraxxus
1 year, 1 month ago
Selected Answer: D
An uninterruptible power supply (UPS) provides short-term power and can protect against power fluctuations. UPS systems give computing devices enough time to perform a logical shutdown or keep them powered until longer-term power systems come online.
upvoted 1 times
...
AshenObelisk
1 year, 3 months ago
This is the last question in the free set. I take my exam tomorrow. Wish me luck, fellas!
upvoted 5 times
...
EighthNotes
1 year, 3 months ago
my journey ends here, taking the test soon will follow up on the first question
upvoted 4 times
...
addcomptia
1 year, 7 months ago
Same I am taking mine 23rd
upvoted 3 times
...
mpengly88
1 year, 8 months ago
I take my exam on Sept 23rd feeling pretty good.
upvoted 3 times
...
nukedukem
1 year, 8 months ago
Selected Answer: D
Up vote on D!
upvoted 1 times
...
andresalcedo
1 year, 9 months ago
Selected Answer: D
D: UPS
upvoted 1 times
...
ApplebeesWaiter1122
1 year, 11 months ago
Selected Answer: D
Deploying an appropriately sized, network-connected UPS device would best meet the requirements as it can provide consistent power levels in case of brownouts or voltage spikes, a minimum of 30 minutes runtime following a power outage, and ability to trigger graceful shutdowns of critical systems. Surge suppressors may be used to protect computer equipment from power spikes, but do not provide power during an outage. A standby, gas-powered generator may provide power during an outage, but may not be cost-effective or efficient for the given requirements. Configuring managed PDUs to monitor power levels can help in monitoring power usage, but does not provide power during outages.
upvoted 4 times
...
workhard
2 years ago
Selected Answer: D
i agree with jskiff1, just wanted to add a voting comment. An uninterruptible power supply (UPS) uses a small battery (often the same type used in motorcycles) as a backup power source if the power ever sags or goes out completely. It’s very common to place a UPS at the bottom of an equipment rack, powering all the devices on the rack with quality, dependable power. A UPS is designed to power a system for a few minutes to enable an orderly shutdown.
upvoted 2 times
...
jskiff1
2 years ago
D. Deploying an appropriately sized, network-connected UPS device. A UPS (Uninterruptible Power Supply) device provides consistent power levels in case of brownouts or voltage spikes and can provide a minimum of 30 minutes runtime following a power outage. It also has the ability to trigger graceful shutdowns of critical systems. Received message. The best option to meet the requirements provided by the systems administrator would be **D. Deploying an appropriately sized, network-connected UPS device**. A UPS (Uninterruptible Power Supply) device provides consistent power levels in case of brownouts or voltage spikes and can provide a minimum of 30 minutes runtime following a power outage. It also has the ability to trigger graceful shutdowns of critical systems.
upvoted 3 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago