A site is considered a warm site when it:

  • A. has basic technical facilities connected to it.
  • B. has faulty air conditioning that is awaiting service.
  • C. is almost ready to take over all operations from the primary site.
  • D. is fully operational and continuously providing services.
Show Suggested Answer Hide Answer
Suggested Answer: C 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
surfuganda
8 months ago
Selected Answer: C
C. is almost ready to take over all operations from the primary site. Warm sites are disaster recovery solutions that have the necessary telecommunications and IT infrastructure but do not have live data. Equipment, including servers and networking hardware, may be present but not fully configured. Warm sites require a short period to become fully operational, making them a middle ground between the faster recovery times of a hot site (which is fully operational and continuously providing services) and the slower recovery time of a cold site (which has basic facilities but no technology until moved there).
upvoted 4 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago