The EMC account team has been asked to design a NetWorker backup solution for a Microsoft Exchange server. The customer's environment consists of a
Microsoft Exchange Server 2007 Cluster Continuous Replication (CCR) deployment on a CLARiiON disk array with EMC VSS Provider and an EMC Disk Library.
The customer wants to leverage the Microsoft VSS framework to protect the Exchange Server 2007 CCR environment. What needs to be considered when designing a backup solution?

  • A. Microsoft Exchange Server 2007 system path and transaction logs must reside on separate directories.
  • B. Exchange server can only be backed up through a Proxy Node.
  • C. Microsoft Exchange Server 2007 database and transaction logs must reside on the same volume.
  • D. Exchange server can be backed up from the Exchange Server 2007 CCR passive node.
Show Suggested Answer Hide Answer
Suggested Answer: D 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
Currently there are no comments in this discussion, be the first to comment!
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...