exam questions

Exam MB-335 All Questions

View all questions & answers for the MB-335 exam

Exam MB-335 topic 1 question 152 discussion

Actual exam question from Microsoft's MB-335
Question #: 152
Topic #: 1
[All MB-335 Questions]

DRAG DROP
-

A company uses the production control module in Dynamics 365 Supply Chain Management.

Production workers require precise instructions to know which tools and parts to use and how to use them when the workers put things together during the assembly process.

You need to configure the system to initiate mixed reality Dynamics 365 Guides for production workers.

Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Show Suggested Answer Hide Answer
Suggested Answer:

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
globeearth
1 month, 1 week ago
A. Enable production instruction in License configuration - ensure that the production instruction feature is enabled in the License configuration F. Mixed reality Dynamics 365 Guides system configuration - configure the system settings for mixed reality Dynamics 365 Guides. D. Configure Guides integration - configure the specific integration settings for Dynamics 365 Guides within the production control module.. Setting the QR code size is part of the Configure Guides integration process (option D). E. Associate a Guide to a bill of material - associate a specific Dynamics 365 Guide with the bill of materials (BOM) used in the production process.
upvoted 1 times
globeearth
1 month, 1 week ago
ignore my earlier response. A. Enable production instruction in License configuration - Enable the necessary configuration keys for production instructions and mixed reality guides in the License configuration settings. D. Configure Guides integration - Configure the integration between D365 SCM and Dynamics 365 Guides. E. Associate a Guide to a bill of material - Link a specific Dynamics 365 Guide to the relevant bill of materials (BOM) in the production control module. C. Add a Guide to a resource - Assign the Guide to a specific resource (e.g., a machine, work cell, or production worker) in the production control module.
upvoted 1 times
...
...
IlseKH
8 months, 1 week ago
I agree with Deetss https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/instruction-guides-in-production-overview also i think it is more likely the "Associate a Guide to a bill of material" also the wording "associate" is used in the headers of the MS Learn plattform..
upvoted 1 times
...
Deetss
9 months, 2 weeks ago
Wrong, should be: 1. Enable production instruction in License config 2. Configure Guides integration 3. Set the size of the rendered QR code (MS Learn link shows this as part of step #2) 4. Associate a Guide to a bill of material. I don't think that it makes sense to assign the guide to a resource as the question does not seem to state one specific piece of equipment/machinery in use.
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...