You have a product that can be manufactured on two different production lines in the same warehouse. You create resources and then create individual input locations for the resources. You create two routes. Each route uses different resources.
Materials are staged for consumption in different locations based on the resources being utilized for production.
You need to set up the formula to consume the goods from the correct line-side location.
What should you do?

  • A. Select a warehouse and consumption operation for each line.
  • B. Select resource consumption and the operation for each line.
  • C. Select the plan group and consumption operation for each line.
  • D. Specify a site in the formula header.
Show Suggested Answer Hide Answer
Suggested Answer: B 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
Daichisan
3 years, 7 months ago
I would say A is correct
upvoted 1 times
Carmelo86
3 years, 2 months ago
No, cause text talks about "creating input locations" on the individual resources
upvoted 1 times
Carmelo86
3 years, 2 months ago
so the correct answer is B
upvoted 1 times
...
...
...
ZVV
4 years, 3 months ago
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/routes-operations#maintaining-routes
upvoted 3 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...