exam questions

Exam NCP-MCI v6.10 All Questions

View all questions & answers for the NCP-MCI v6.10 exam

Exam NCP-MCI v6.10 topic 5 question 76 discussion

Actual exam question from Nutanix's NCP-MCI v6.10
Question #: 76
Topic #: 5
[All NCP-MCI v6.10 Questions]

Refer to the exhibit.

An administrator is looking at the memory cluster runway diagram, as shown in the exhibit. The environment is based on three hosts. Each host is configured as follows:
• CPU: 2x Intel Xeon Gold 8 cores at 2.6 GHz
• RAM: 256 GB
• Storage: 2x 1.92 GB SSD, 4 x 4 TB HDD
The Intelligent Operations feature has been activated one month ago with no further configurations.
What does the dotted red line mean?

  • A. It is the usable capacity based on cluster configuration options.
  • B. It is the maximum memory the administrator can assign to VMs.
  • C. It is the default trend analysis static threshold that can be manually set.
  • D. It is the calculated memory oversubscription limit for currently running VMs.
Show Suggested Answer Hide Answer
Suggested Answer: C 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
0251cff
6 days, 4 hours ago
Selected Answer: C
Sorry: ignore my previous remark
upvoted 1 times
...
0251cff
6 days, 5 hours ago
Selected Answer: A
https://portal.nutanix.com/page/documents/details?targetId=Prism-Central-Guide-vpc_2022_6:mul-explore-entities-hardware-pc-c.html
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
exam
Someone Bought Contributor Access for:
SY0-701
London, 1 minute ago