Before installing array rails, where should the cage nuts be placed?

  • A. Lowest square of lowest RU
  • B. Lowest square of top RU
  • C. Top square of the lowest RU
Show Suggested Answer Hide Answer
Suggested Answer: A 🗳️

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
5b0296b
1 month, 2 weeks ago
Selected Answer: C
Before installing array rails for a FlashArray system in a square-hole rack, the cage nuts should be placed on the front of the rack. More specifically, they should be installed three holes up from where the bottom of the rail flange will be. Interpreting this instruction in the context of rack units (RU), where each RU typically contains three holes, "three holes up from the bottom of the rail" translates to the top square of the lowest RU that the rail will occupy. Therefore, the correct answer is: C. Top square of the lowest RU Correct answer can be found on the following pure storage documentation: 50-0027-05.pdf FlashArray//XL Installation Guide
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...