Avaya 7003 Exam Actual Questions

The questions for 7003 were last updated on April 19, 2024.
  • Viewing page 1 out of 17 pages.
  • Viewing questions 1-4 out of 69 questions

Topic 1 - Single Topic

Question #1 Topic 1

A technician deployed a Communication Server 1000E with dual homing feature configured. Both the T and 2T ports are connected on the media Gateway
Controller (MGC) one connection is active to avoid network loops.
Which two statements are true, if the connection to the active port on the MGC is host?
(Choose two)

  • A. The MGC will issue a link down error.
  • B. The MGC will switch to the active pert.
  • C. The MGC and CPPM will have no loss of service.
  • D. The MGC will switch to the active port after 12 seconds.
Reveal Solution Hide Solution   Discussion  

Correct Answer: BC 🗳️

Question #2 Topic 1

A customer has deployed a Communication Server 100 Rls. 7x system at their site. The technician has been asked to add the Call pickup feature to the 100 IP telephone in the sales department. The customer wants to be sure active calls not lost when the changes are made.
Which Phones Configuration feature can be enabled that will ensure changes to the telephone are not transmitted to the call server until the telephone are busy?

  • A. Bulk change
  • B. Courtesy change
  • C. Group change
  • D. Template change
Reveal Solution Hide Solution   Discussion  

Correct Answer: B 🗳️

Question #3 Topic 1

A customer wants to build a new Ip node on their Communication Server (CS) 1000E system with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and personnel directories. A technician logs into Elements manager to complete the configuration, after creating and saving the node configuration, the transfer now option chosen, then the servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?

  • A. The node file will be transferred from Signaling Servers to the call servers, and INI files will be transferred from the call server to the selected servers.
  • B. The node file will be transferred from Call Servers to the Signaling servers, and the INI files will be transferred from the Call Servers to the selected servers.
  • C. The node file will be transferred from Signaling Servers to the Call Server, and the INI files will be transferred from Call Servers to the Signaling servers.
  • D. The node will be transferred from Element manager to the call server, and INI files will be transferred from Element manager to Call Server.
Reveal Solution Hide Solution   Discussion  

Correct Answer: B 🗳️

Question #4 Topic 1

A customer wants to deploy an Avaya Server (CS) 1000 Rls. 7x system in Avaya Aura solution. They plan to have the system support 50,000 users.
Which system type will meet the customers needs?

  • A. CS 1000E Co-Resident Call Server and Signaling Server
  • B. CS 1000E Standard Availability (SA)
  • C. CS 1000E High Availability (HA)
  • D. CS 1000E High Scalability (HS)
Reveal Solution Hide Solution   Discussion  

Correct Answer: D 🗳️

Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...