Welcome to ExamTopics
ExamTopics Logo
- Expert Verified, Online, Free.
sale

Want to Unlock All Questions for this Exam?

Full Exam Access, Discussions, No Robots Checks

HP HPE0-S22 Exam Actual Questions

The questions for HPE0-S22 were last updated on April 23, 2024.
  • Viewing page 1 out of 15 pages.
  • Viewing questions 1-4 out of 63 questions

Topic 1 - Single Topic

Question #1 Topic 1

A customer has a Hadoop big data and analytics solution. The customer needs a server upgrade to improve performance for this solution and plans to add more solutions that draw on the data, such as a Cassandra NoSQL database. The customer is interested in a flexible HPE Big Data Reference Architecture approach.
Which solution meets the customers needs?

  • A. HPE Moonshot 1500 Systems with m700 cartridges for co-located compute and storage nodes
  • B. HPE Apollo 4530 Systems for co-located compute and storage nodes
  • C. HPE Apollo 8000 Systems for the compute nodes and HPE Superdome X Systems for the storage nodes
  • D. HPE Moonshot 1500 Systems with m710 cartridges for the compute nodes and HPE Apollo 4200 Systems for the storage nodes
Reveal Solution Hide Solution   Discussion   1

Correct Answer: D 🗳️

Question #2 Topic 1

A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.
What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?

  • A. how to use SCCM to provide a graphical installation method for new nodes
  • B. how to use VSP to provide a graphical installation method for new nodes
  • C. how to add an mRCA module to provide a graphical installation method for new nodes
  • D. how to use iLO remote console to provide a graphical installation method for new nodes
Reveal Solution Hide Solution   Discussion   1

Correct Answer: C 🗳️
Explanation -
In order to interface with the specific server cartridge node, the mRCA must be installed in a specific slot within the chassis, relative to the linking server cartridge.

Reference -
https://h20565.www2.hpe.com/hpsc/doc/public/display?sp4ts.oid=5365577&docLocale=en_US&docId=emr_na-c04785597

Question #3 Topic 1

A customer is planning a multi-threaded HPC solution that would benefit from threads running in parallel.
The architect selects the HPE Apollo 6000 and needs to choose between the HPE XL230a and the XL250a compute tray.
What is one reason for choosing the XL250a tray?

  • A. The HPE XL250a server supports DDR4 HPE Smart Memory.
  • B. The HPE XL250a server supports dual accelerators.
  • C. The HPE XL250a server provides full length PCIe expansion slots.
  • D. The HPE XL250a server delivers dual processor performance.
Reveal Solution Hide Solution   Discussion   3

Correct Answer: B 🗳️
The HPE ProLiant XL250a Gen9 Server delivers 2P performance for your budget with dual accelerator support, while leveraging the HPE Apollo 6000 System and its modular flexibility and rack-scale efficiency. This server features the Intel Xeon E5-2600 v3/v4 series processors and 16 DIMM slots are ready with DDR4
2133 (1024 GB maximum)/2400 (2048 GB maximum) MHz memory and HPE SmartMemory.

Reference -
https://www.hpe.com/nz/en/product-catalog/servers/proliant-servers/pip.hpe-proliant-xl250a-gen9-server.7307070.html

Question #4 Topic 1

An architect takes the following notes during a meeting with a customer:
✑ plans to introduce an entirely new service offering to customers
✑ servers will be virtualized and will consume large amounts of storage space
✑ project is to operate in an isolated section of the data center with limited access to the corporate network
✑ need flexibility to grow quickly as required by the new service demands on the infrastructure
✑ has no repeatable process for firmware management
✑ concerned about how long it will take for the project team to become productive on the new infrastructure
Which solution should the architect propose to help the customer overcome all of its project challenges?

  • A. HPE BladeSystem solution with HPE 3PAR storage
  • B. HPE Apollo 6000 solution with HPE 3PAR storage
  • C. HPE ConvergedSystem 700 solution with HPE 3PAR storage
  • D. HPE Apollo 2000 solution with HPE 3PAR storage
Reveal Solution Hide Solution   Discussion   2

Correct Answer: B 🗳️

Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...