An engineer must configure a new Cisco UCS B-Series infrastructure with a Cisco 5108 chassis. The configuration must meet these requirements:
• The setup must use aggregation between Cisco UCS Fabric Interconnects and I/O modules.
• The implementation requires four 10 GbE connections per I/O module.
• The Cisco UCS Fabric Interconnects must support uplinks of different speeds for future expansion.
Which two steps must be taken to meet these requirements? (Choose two.)
Rollizo
11 months agoRollizo
10 months agowickkkkkkkkkkkkkkkkkk
1 year, 4 months agoJCGO
1 year, 7 months agoprospio971
1 year, 5 months ago