An engineer must implement the FCoE on the Cisco Nexus 9000 Series Switch-based infrastructure. The deployment will contain dual-homed fabric extenders and must support jumbo frames with port channels. Which two sets of actions complete the configuration? (Choose two.)

  • A. Create a virtual Fibre Channel Interface. Bind vFC to physical interface.
  • B. Configure the interface with mtu 9516. Disable the feature NPIV.
  • C. Create a dedicated VSAN for FEX. Bind VSAN to FEX uplinks.
  • D. Execute fcoe enable-fex. Configure FEX uplinks with mtu 9216.
  • E. Create a FCoE switch profile. Enable config sync.
Show Suggested Answer Hide Answer
Suggested Answer: AD 🗳️
Reference:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/92x/fcoe/configuration/guide/b-cisco-nexus-9000-nx-os-fcoe-configuration- guide-92x/b-cisco-nexus-9000-nx-os-fcoe-configuration-guide-92x_chapter_0100.pdf

Comments

Chosen Answer:
This is a voting comment (?). It is better to Upvote an existing comment if you don't have anything to add.
Switch to a voting comment New
GuyThatTakesDumps
8 months ago
Selected Answer: AD
A and D yes!
upvoted 1 times
...
JCGO
1 year ago
AD looks legit. https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/92x/fcoe/configuration/guide/b-cisco-nexus-9000-nx-os-fcoe-configuration-guide-92x/b-cisco-nexus-9000-nx-os-fcoe-configuration-guide-92x_chapter_0100.pdf
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...