Refer to the exhibit. The MDS-EDGE-Switch and MDS-Core-Switch are configured with NPV and NPIV features. The FLOGI from Cisco UCS is received by the
MDS-Core-Switch on interface fc1/2. An engineer tried to move all traffic between the MDS-EDGE-Switch and MDS-Core-Switch from interface fc1/2 to fc1/3, but the attempt failed. Which set of actions completes the configuration?
Annielover007
6 months, 1 week agoGuyThatTakesDumps
7 months, 2 weeks ago